18
Years of experience in Water Management, Electrical & Civil Engineering
Our portfolio showcases a diverse range of projects, each reflecting our commitment to excellence and our ability to deliver complex solutions on time and within budget. From residential developments to major infrastructure projects, our work speaks for itself.

# | MAIN PROJECTS | STATUS | CLIENT | |
1 | Construction of New warehouse 30*20m Main Contractor – ENPPI Indoor Warehouse –Supply and Install Of Steel Structure With 0.5m Corrugated Zinc Sheet for roof and wall With Dimension 30*20m, Center clear Height is 6.5m & Side Clear Height is 5.5m, Second and forth roof bay are removable with Lifting Hooks | Completed 2013 | Saudi Aramco / Safaniyah | |
2 | Civil works at package #6 Main Contractor – Petrol Steel Co. Ltd Construction of cable trench and open ditches and other miscellaneous foundation | Completed 2013 | SATORP | |
3 | Mechanical & Piping Works at SIPCHEM Main Contractor – e-TEC ARABIA LTD Mechanical erection and A/G piing works for IDC expansion at SIPCHEM | Completed 2014 | SIPCHEM | |
4 | New office facility Main Contractor – VTEC SUPPORT SERVICES Construction of new HQ office at Khobar including flooring, wall partitions, ceiling, painting etc. | Completed 2015 | VTEC SUPPORT SERVICES | |
5 | Civil and Temporary Facilities at JAZAN Main Contractor – MCCL Civil and temporary facilities works including portable offices, camp, toilet block, fencing, car parking and concrete walk way. | Completed 2016 | ARAMCO | |
6 | Various miscellaneous projects Main Contractor – EXPERTISE Miscellaneous civil works for pre-shut down and maintenance project of various SABIC plants in Jubail | Completed 2017-2018 | SABIC | |
7 | Support Services Main Contractor – L & T E & A Saudi Arabia Co.Ltd Hiring of equipment & Support services for Riyadh H.O | Completed 2019 | L & T E & A Saudi Arabia Co.Ltd | |
8 | Civil works for communication and Security system at fadhili Gas Plant Main Contractor – WIPRO / MET ARABIA Concrte foundation, cable trenches and shelter including excavation and backfilling at Saudi aramco Fadhili Gas Plant for Wipro Arabia Ltd. | Completed 2018 | SAUDI ARAMCO / FADHILI GAS PLANT | |
9 | Rigging Services for Abqaiq Recovery Plant Main Contractor – ENPPI Supply of Riggers and other rigging equipment’s with crane and Boom truck | Completed 2019 | SAUDI ARAMCO / ABQAIQ PLANT | |
10 | Construction Fence including civil works for Diesel generator for Security control Building Main Contractor – WIPRO ARABIA LIMITED Supply and laying of filling, gravelling, fencing and gate | Completed 2019 | SAUDI ARAMCO / FADHILI GAS PLANT | |
11 | Process, Fire water & Strorm Water line for Shybah Crude Stabilization Project at Abqaiq. Main Contractor – ESSAR PROJECTS SAUDI CO. LTD Laying of RTR Pipe line for Storm water drain, fire water CS pipe line for Process line including lamination, testing excavation, backfilling and concrete Manholes/ catch basins/valve pits etc. | Completed 2019 | SAUDI ARAMCO / ABQAIQ PLANT | |
12 | Fabrication & Erection for HDPE Main Contractor – ENPPI Fabrication & Installation of HDPE Pipe by butt fusion joining & Hydro test for installed HDPE Pipes | Completed 2021 | Saudi Aramco/Safaniy ah | |
13 | Civil work for Shybah Crude Stabilization Project at Abquaiq Main Contractor – ESSAR PROJECTS SAUDI CO. LTD Construction of concrete dyke wall, structural filling, asphalt road, road barriers, concrete pavement and other miscellaneous foundations. | Completed 2020 | SAUDI ARAMCO / ABQAIQ PLANT | |
14 | Civil work for (Additional Surge line ) inside Yanbu Refinery /Aramco Premises for CFIF project at Yanbu KSA Main Contractor – Domus Lloyd Contracting Co. Ltd Construction of concrete sleepers, duct banks, transformer foundation and other miscellaneous structures. | Ongoing 2020 | YASREF/ SAUDI ARAMCO | |
15 | Fabricate, Supply and installation of return air duct Main Contractor – Globel factory for chemical Industries Fabricate, Supply and installation of return air duct using GI Sheet 0.7mm (Gauge#22) thickness as per provided layout Drawing. | Completed 2021 | Globel factory for chemical Industries | |
16 | Fabrication & Erection for HDPE Main Contractor – ENPPI Fabrication & Instalation of HDPE Pipe(8″ & 6″) by butt fusion joining & Hydro test for installed HDPE Pipes (8″ & 6″) | Completed 2021 | Saudi Aramco/Safaniyah | |
17 | Civil Works Main Contractor – Power of Solidarity co Excavation, Filling with imported soil, Supplying and Laying of Concrete, etc | Completed 2021 | Saudi Aramco/Rastanura | |
18 | Civil works for Replacement of Eleven (11) BRRI Pipe lines Main Contractor – Domus Lloyd Contracting Co.Ltd/L&T Civil Works at abuali for installation of Onshore pipeline works and Associated activities for Saudi Aramco”s Replacement of Pipeline BRRI Field Project in KSA | Completed 2023 | Saudi Aramco/Abuali |